CASE STUDY: Omni Components Cuts Production Time While Improving Quality Customer Request A leading measurement and control product developer and manufacturer more than tripled annual requirements for a complicated large turned component. Production Challenge The Pump Body, a very detailed and intricate part, originally needed three machines to complete. This meant extra handling time for each part – more chances for quality issues and a long lead time. Timely Solution The Okuma Multus B300 was capable of holding all the tools necessary on board. Using this one machine cut production time down by 22% and increased quality significantly. High-Performance Result Our Customer was especially satisfied with the consistent quality of their order and the improved lead time. The end product component is used in pressure hand pumps that calibrate devices.
|
|
|||||||||||||||||||||||